ScottMadden assisted a large investor-owned electric utility review a warehouse design/build package developed for one of its largest fossil plants.

Challenge
  • uManagement at a large fossil generation plant needed to relocate materials storage to accommodate a major scrubber project
  • uThe company proposed building a consolidated warehouse to accommodate existing and new inventory
  • uA third-party review of the proposed warehouse design was retained to determine if the design:
    • Met user needs with respect to materials storage and access
    • Made effective and efficient use of space
    • Facilitated effective material movement and handling
    • Met standard lighting and safety requirements
    • Was flexible enough to meet future storage and handling requirements
Solution
  • uReviewed the preliminary warehouse design/build package, architectural plans, aerial photographs of the plant site and previous ScottMadden reports on the plant's and company's warehouse and inventory management needs
  • uAssessed current space requirements
  • uDeveloped space projections for future needs
  • Developed improvement recommendations for:
    • User needs
    • Warehouse location and orientation
    • Material handling equipment
    • Building size
    • Warehouse layout: general
    • Warehouse layout: dock areas
    • Warehouse layout: racking
    • Health and safety
Results
  • uRedesigned warehouse layout, which resulted in optimized storage space and a safer operating environment
  • uProvided a comprehensive plan that was used by engineering and construction representatives to modify the original build package